Make your move in orbit

LYOBA, the missing logistics layer beyond LEO

For most payloads, reaching MEO, GEO, or any high-energy orbits is slow, inflexible, or prohibitively expensive. LYOBA is here to change that.

LYOBA is a high-performance kick stage that rides to LEO on frequently launching international partner operators. From there, it takes over moving up to 5 tonnes to MEO, GEO, or any high-energy orbits in under 24 hours, dramatically reducing the cost of accessing these orbits.

With LYOBAWithout LYOBA

Orbit reached in 24h

Ready for Operations

Storable propellants to move on your schedule.

In-space propulsion systems that use cryogenic propellants face boil-off within hours, forcing a tight fuelling schedule and costly ground segment equipment. LYOBA skips that: RP-1 and HTP, the storable propellants we use, need no cryogenics infrastructure to install or maintain, so launch operations save on cost while LYOBA moves on its own schedule.

Cryogenic solutions

Pressure rise and usable fuel decrease over time.

PAVE Space's Storable Solution

Pressure and usable fuel stable.

LYOBA

Maiden flight
2029
Max payload
5000 kg

Storable propellant tanks

RP-1 and HTP, held for months instead of hours. No boil-off clock means the stage waits for the last payload on the plate.

Maiden flight

2029

Scheduled

Key Technical specifications

Orbits served
MEO, GEO, TLI, LLO & deep space
Payload mass
up to 5000 kg (structural limit)
Max volume of payloads
Rideshare ½ plate, rideshare ¼ plate, full plate, cake topper, dedicated
On-pad and on-orbit raising power
900 W available in dedicated configuration (additional available)
Deployment systems
From 8” to 1575 mm, four-point footprints
Delta-V
4 to 7 km/s
Propulsion system
45 kN (LYOBA's main engine)
Propulsion
storable HTP + RP-1

Related logs